ZACATÍN-CARFERRO (GRANADA) VIADUCT 260M
12-mayo-2015
Assembly of a 260-metre-long viaduct with 6 spans.

Every span has 8 precast concrete beams, up to 100 tons each beam.

The beams were assembled with and LR1600/2 crane, supported by another LTM1100/2 crane for the loading and unloading of the main cranes´s Derrick.

www.youtube.com/watch